With lifting straps and ROV shackles from Nøsted & Fram, Aker Solutions' first subsea manifold for Petrobras was successfully installed at Iracema a Sul Field in Santos Basin.
We congratulate Aker Solutions on the successful installation of the first WAG (Water Alternating Gas) manifold in Brazil, at a depth of more than 2,200 meters. This is one of Aker Solutions' deepest installations in the world.
A total of 4 manifolds were installed with Slingmax fiber sling and ROV shackles delivered from Nøsted & Fram.